◎ 题干
  A new eight-kilometer road is under construction that links the port area with motorway system. It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city. As part of the project, two four-kilometer road tunnels are being built below the central area of the city, one for traffic to the north and the other for the traffic to the south. The two tunnels are about 20 meters below the surface and are 12 meters wide, providing for two lanes of traffic in each direction. 

In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel. The lighting is at the top of the tunnel, practically at its highest point. There will also be electric signs at frequent intervals. They show traffic conditions ahead and can be seen clearly by drivers. The wall is made up of four main elements, which include a waterproofing covering and, on the inside of the tunnel, a concrete lining.
Each tunnel is roughly round and the lower part of the tunnel is somewhat flat. The surface of the road lies on the base, which is made of concrete and steel. The drainage system, just below the road surface on one side, removes any extra liquid, particularly water. In the event of fire, the fire main, which is made of steel, pipes water to many fire hydrant stations at regular intervals along the length of the tunnel. The fire main is at the side of the tunnel and at the level of the road surface. Other systems in the tunnel will include emergency phones.
小题1:Each of the tunnels under construction is _____.
A.eight kilometers long and twenty meters wide
B.eight kilometers long and six meters wide
C.four kilometers long and twenty meters wide
D.four kilometers long and six meters wide
小题2:Which part of the tunnel in the diagram is used to pipe out extra water?
A. 1           B. 3            C. 5               D  6 
小题3:Driving in the tunnel, one can know the traffic conditions ahead through______.
A.the lightsB.the electric signs
C.the trucks and the carsD. the emergency phones
小题4:The passage is mainly about _____.
A.the construction of a roadB.the design of a road
C.the construction of two tunnelsD.the design of two tunnels
◎ 答案
查看答案
◎ 解析
查看解析
◎ 知识点
    根据n多题专家分析,试题“ A new eight-kilometer road is under construction that links the port area with motorway system. It is expected to carry 20,000 trucks and cars a day, which gre…”主要考查了你对  【科教类阅读】  等知识点的理解和应用能力。关于这些知识点的“档案”,你可以点击相应的链接进行查看和学习。